Page

Investment

10.70

MW

Bungal Hydropower Limited

Bungal Hydro Limited (BHL) is the developer of 10.70-MW Run of the River (R-O-R) hydroelectricity project at Bungal Municipality of Baihang district, Nepal. The company has officially commenced billing of electricity to Nepal Electricity Authority(NEA) from Bhadra 01, 2080.

 

Sanigad Hydropower Limited

Sanigad Hydro Private Limited (SHPL) is 38.5 MW hydroelectric project in the Bajhang district, Sudurpaschim Province of Nepal. It is a run of River Project with a gross head of 585.50 m. It has officially commenced billing of electricity from Falgun 05, 2079.

38.5

MW

 

15.33

MW

Kalanga Hydropower Limited

Kalanga Hydro Electricity Project with 15.33 MW capacity, is a run-of-river type project located in Sunkuda and Khiratadi VDCs of Bajhang district of Seti Zone of Far – Western Region of Nepal. Hydropower officially commenced billing of electricity to NEA from Magh 26, 2079.

 

Gurans Hydropower Pvt. Ltd

Gurans Hydro Electric Project is based on the Sankhuwa River with a project capacity of 41.06 MW. The project is conveniently situated at the foothills of Sankhuwasabha district. The project is currently under construction and is most likely to come into operation by the year 2025.

41.06

MW